What Is a Coordination Study?
A protective device coordination study analyzes how the breakers, fuses, and relays in your electrical system respond to faults. The goal is selective coordination: when a fault occurs, only the protective device closest to the fault should trip — not the main breaker that shuts down the entire facility.
The study begins with a short-circuit analysis to determine available fault current throughout the system, then evaluates protective device settings using time-current curves.
Why It Matters
- Minimize downtime — a single ground fault shouldn't take down a production floor. Proper coordination isolates faults to the smallest possible area.
- Personnel and equipment safety — correctly set devices clear faults quickly, limiting arc flash energy and equipment damage.
- Code compliance — coordination is required by the NEC for critical systems such as emergency, legally required standby, and healthcare facilities, and it is a core input to any NFPA 70E arc flash assessment.
- System changes — if you've added equipment, replaced breakers, or your utility has upgraded its service, your existing settings may no longer coordinate.
What's Included
- Data collection — field documentation of transformers, breakers, fuses, relays, and conductors, plus utility fault current data.
- Short-circuit analysis — calculated fault currents at every bus, checked against equipment interrupting ratings.
- Time-current curves — plotted device characteristics showing how each device responds, with coordination verified graphically.
- Settings recommendations — specific trip settings for adjustable breakers and relays to achieve selective coordination.
- Report — a complete report with one-line diagrams, analysis results, curves, and recommendations you can hand to your maintenance team or authority having jurisdiction.